FASL Aje Installation ProjectAje Field Development Project involved connecting two subsea wells to the existing FPSO via a 3km tie-back, utilizing a manifold at the drill center.
AMNI Okoro Flexible Flowline ReplacementInstallation engineering and safety studies including HAZID and SIMOPS studies for installation activities around the FPSO and WHP.